i would be surprised if Blue actually has much to do with this at this point. they are probably along for the ride as we are. Seems like Blue clearing the land for the liftline is innocent enough, but them being liable for actual construction seems unlikely. 1) let someone else assume the risk. 2) have some outside contractor to blame if its not done on time, or some other failure.
Sort of wonder if there is a penalty clause with LP for completion by a certain date. With the way things are these days, i would doubt it.