Jump to content

enjoralas

Members
  • Posts

    4074
  • Joined

  • Last visited

  • Days Won

    58

Everything posted by enjoralas

  1. Yeah, I was watching the rigging crew walk back and forth between the towers and the heads. Looks like when they take the tower head up they lower it to the ground, dudes jump on, and then they lift it up and place it and the dudes bolt it down. That's bonkers, lol EDIT: I was coming to post "Ben, nice job moving the valley cam, not zoom the Main st cam out just a touch
  2. It's amazing how quickly they are able to move from one tower to the next. I wonder if there is more than one crew working up the hill. This next one should be pretty visible on the Main St cam
  3. Wish that Main St cam was zoomed out a bit . ..
  4. PASR crashed their dialup
  5. Helichopter work happening . . .
  6. Sexy.
  7. Starting to look a little bit like a lift, at least:
  8. Lot of fog out there, but also activity around the towers staged in the learning area, so maybe they are going. @Benmneeds to keep us updated on the radio chatter so I know whether to keep checking in. 😉
  9. Camel's lift is on the (slow) move, with two chairs on the rope.
  10. Was thinking about that today. The other new 6-pack in the Poconos has been up for months, and they are still working on it daily. Still excited to see more than dirt on the webcam tho
  11. I feel like @Benm gonna take the dog for another walk this afternoon and take a pic sitting on one of those wrapped pallets so he can claim bragging rights of the first person to sit on the new chairlift
  12. So, so smooth . . .
  13. Should have checked Facespace, I see the head assemblies are in fact there now.
  14. Never smooth enough. Back at it again, lol. That little dozer is like the cleanup bot in Wall-E that goes around behind them cleaning up the dirty footprints. Nice. I think Ben was right and the main tower structures have been in the lot for some time now. Thought there would be head assemblies with sheaves there by now too though.
  15. Hey now, TWO poles. Sure, that's only one more than you thought, but it's also TWO HUNDRED percent of the progress you thought they had!
  16. Yup, going up baby!!
  17. The dirt around the sheds has never looked smoother.
  18. Wrong. Zack's Taco Shack or GTFO
  19. Looks like the Pocono's first bubble chair is on the move, it's hanging out about halfway up the mountain. Probably doing a slow speed pull through and checking for clearances/trimming trees maybe? It's been in that spot since I first looked about an hour ago
  20. Correct, it was Knoebels. Thought it was a cool pic, with all the campfires and everything up in the campground past Twister. You didn't miss much. Flying turns was fun, we took one ride during ERT. Flyer was down all weekend, they replace the ERT in the morning on that with the Bumper Cars. Took 2 rides on Phoenix during the evening ERT. It was running really well, always does during PPP. My theory is that the heavy fog effects from the antique car ride (and lately in the Phoenix tunnel itself) help slick the track and make it run fast. But beyond that, the lines were bonkers. We headed back to camp right after the free lunch and didn't go back to the park until 9pm. They had closed the line for the haunted train ride so we rode the sky ride then hit up ERT. Sunday was a pleasant day in the park though
  21. There were some sporadic people on the cam at Camel too. I guess they work in the rain up there. To be fair, they also have something to work on.
  22. Rode a ski lift over the weekend. Pic from Saturday night, 10/8/22
  23. Resolution sucks, but looks like the Pocono's first bubble chair is hung in the lower terminal
  24. Based on this part of the pic Airhead posted, the t-bar line looks right out, looks like they cut into it completely halfway down. The new lift line looks pretty poachy between Come Around and the bottom of Chute, depending on what's on the ground there, of course
×
×
  • Create New...