Jump to content

JFskiDan

Members
  • Posts

    7663
  • Joined

  • Last visited

  • Days Won

    135

Everything posted by JFskiDan

  1. https://liftblog.com/2022/05/29/new-snowbird-tram-cabin-damaged-during-installation/ Watch the tram car please. https://publish.twitter.com/?query=https%3A%2F%2Ftwitter.com%2FPAdamFrancis%2Fstatus%2F1532031610870042624&widget=Tweet
  2. we need some "insider information" really hoping to see some big holes being dug soon.
  3. You cant control these by now? WTF?
  4. Oh yeah, i think they had some type of sundae bar, i didnt really pay attention to it, as much as i like desserts. they had some baller bread pudding though. I'm not sure if the sundae bar was a huge hit, as it was a "adult only" reception, which is another thing i found to be pretty awesome about the whole thing. The cake was sliced up and put into to go bags. Weddings sure have changed alot over the past years.
  5. I didnt take any bathroom selfies, but the wedding i went to Friday night was such a good time. The Church didnt burst into flames since i was there, (kind of the running joke) Cocktail hour was filled with the best horsey-duvers, there was an italian end and a seafood end for plated food.....lobster tails, mussels marinara, little necks, calamari, and lobster mac. I kinda looked at the whole thing and was like, i kinda remember filling out a dinner card, but this looks like dinner, but with tiny plates. Beer selection was odd, but ok, people are really into the seltzers. the weather was stellar, and the after party was outside on the patio after the reception, of course, with more food. Best part is, it was probably 1/2 a mile from my house.
  6. All of that makes sense too. the chairs are actually in pretty decent shape, unlike the painted, repainted, and painted 5 more times BB chairs.
  7. The fact they are taking the lift station apart and lifting it off, rather then smashing it the fuck up with the track hoe, makes that somewhat plausible.
  8. Something bumped into it. Happy accident. Im in for a little PASR Parking Lot lift tower assembly tailgate for the Summit Safari Super 6 Pack Supreme. However, i dont think this will be for a little while, but planning ahead is always important.
  9. Nice. Now how about some lift construction pics?
  10. I feel that we will see lift chairs spread throughout the mountain as benches. I think they will have a few left over. Unless of course, like i mentioned earlier, that possibly they did sell some of them off to some other resort, and really did have a "limited quantity" to sell off.
  11. I wonder if they will regrade the bottom of Burma so its a little easier for people to get on shuttle? They should have some dirt they need to get rid of.
  12. Summit Safari Super 6 Pack Supreme
  13. I would have to assume this has a lot of plans and permitting in the works. I seem to recall they got a little heat from some type of government agency over the digging of one of the snowmaking ponds. Like i think they just all of a sudden decided to dig one out of the blue, maybe cause they were bored. I wouldnt want to put up a device made to carry 1,000's of people in the air on my property without permits or inspections, no matter who actually hold the contract for it.
  14. Thats probably just leftover @mbike-ski equipment they found in the woods.
  15. Is it ridiculously humid there? That seems like a lot of water for a sweating line. My vote goes to the condensate pump. Nice thing about having the air handler in the attic is the system should work well since cold air sinks. As opposed to mine being in the basement and just really cooling the floor above.
  16. i had mine serviced last year, which is when they found where its leaking refrigerant. so, of course "i need a whole new system due to its age". Pricey. luckily, i have a big jug of refrigerant that i will give it a little shot of every year until if finally explodes.
  17. No way. i prefer to be cold over hot. A/C has already been tested at my house. Oddly enough, its currently 60 degrees in my house in the Poconos. Its gonna be wonderful.
  18. How much are they selling those for? if a chair is $1200, thats worth $25,000 all day long.
  19. More importantly we will need some pics of lift construction.
  20. Eventually they will have to handle any chairs they dont sell. Employees probably will want to be paid for doing that. Theres kind of a balance between making some coin on your junk, and having it all disappear with the least amount of effort.
  21. Some pretty interesting comments, some of which have been posted here. the one i find interesting is that Blue mentioned something about "limited quantities". and thats one of two things........typical BM way of people to open up their purse strings and pony up, or, there are in fact limited quantities, like they sold 200 to Bear Creek, and they actually only have 50 to sell, which would make sense for their over the top price on them. They are nice chairs, like nicer than what BB sold, but IMO not $1200 nice.
  22. Agree. with the checkered past that lift has, i would probably be replacing that at night, and not boasting about it on Facespace. They are just opening themselves up for ugly comments. like, "Exciting times ahead for the most dangerous mountain in Pennsylvania"
  23. I guess at some point the new lift crosses main street/Burma? I mean, at this point they are really committed to this new lift. It would kind of suck at this point if there is some type of Blue Mountain catastrophe that prevents them from getting it done.
×
×
  • Create New...