Well they need to have the lift running by mid. November to test that thing. It actually takes longer to get the wire, and chairs on, becuase the way to put wire around a lift takes a really hard time. It needs to be the right length, and the right tightness/slackness. If it has TO much slack, then it won't work, and they need to tighten it. They use a little nifty gadget to make sure the right pressure is there. Then the chairs. They, need to be the correct spaces.