toast21602 Posted June 25, 2022 Report Posted June 25, 2022 54 minutes ago, RidgeRacer said: This is perhaps premature but I'm beginning to wonder if this will be completed in time for opening day. they still have ~5 months. I think it will be done, tested, and inspected before that. Quote
GrilledSteezeSandwich Posted June 25, 2022 Report Posted June 25, 2022 (edited) 2 hours ago, RidgeRacer said: This is perhaps premature but I'm beginning to wonder if this will be completed in time for opening day. I’m sure they have access to a calendar. Nothing to worry about and amazing that we won’t have to park up top anymore early season. Edited June 25, 2022 by GrilledSteezeSandwich Quote
JFskiDan Posted June 25, 2022 Report Posted June 25, 2022 3 hours ago, RidgeRacer said: This is perhaps premature but I'm beginning to wonder if this will be completed in time for opening day. I think they are moving along ok, maybe not setting the world on fire but seeing some really big holes in the ground is a very good thing. But of course, those holes are probably the easiest ones to dig and access. I think the big thing for making this all work, is when the concrete for the towers goes in the ground. I am pretty sure there will need to be significant cure time on the concrete before they can set towers on them. Like maybe a month or so. Keep in mind, since the main street and burma lifts are gone, and those chairs all sold off, not completing this on time will be the mother of all fuck ups. 2 Quote
GrilledSteezeSandwich Posted June 25, 2022 Report Posted June 25, 2022 1 hour ago, JFskiDan said: I think they are moving along ok, maybe not setting the world on fire but seeing some really big holes in the ground is a very good thing. But of course, those holes are probably the easiest ones to dig and access. I think the big thing for making this all work, is when the concrete for the towers goes in the ground. I am pretty sure there will need to be significant cure time on the concrete before they can set towers on them. Like maybe a month or so. Keep in mind, since the main street and burma lifts are gone, and those chairs all sold off, not completing this on time will be the mother of all fuck ups. @Ski2Live Live2Skican start his business shuttling people to the summit lodge from the valley in his Subaru SUV if that happens. Quote
Schif Posted June 25, 2022 Report Posted June 25, 2022 I think we will see concrete this week. It's a decent sized risk to open up those holes and let them get rained on. I would love to see the forms being built. 1 Quote
GrilledSteezeSandwich Posted June 25, 2022 Report Posted June 25, 2022 (edited) 7 minutes ago, Schif said: I think we will see concrete this week. It's a decent sized risk to open up those holes and let them get rained on. I would love to see the forms being built. Will there be rebar? How deep do you think they go with the foundations? Schif I always forget that you went to school for engineering before you became a businessman. Edited June 25, 2022 by GrilledSteezeSandwich Quote
mikes781 Posted June 28, 2022 Report Posted June 28, 2022 Metal power structure thing came down this morning. 1 1 Quote
Benm Posted June 28, 2022 Report Posted June 28, 2022 concrete is supposedly being poured 'down there at the lift project' today. 1 Quote
Schif Posted June 28, 2022 Report Posted June 28, 2022 It's going to be interesting to see a concrete pumping truck drive up main street 1 Quote
toast21602 Posted June 28, 2022 Report Posted June 28, 2022 51 minutes ago, mikes781 said: Metal power structure thing came down this morning. I was hoping that thing would somehow make it through all of this. RIP. 2 1 Quote
JFskiDan Posted June 28, 2022 Report Posted June 28, 2022 1 hour ago, mikes781 said: Metal power structure thing came down this morning. someone is going to need to show me where/what this thing is. i like to think i am fairly aware of things, but i have no idea what you guys are talking about. Quote
Benm Posted June 28, 2022 Report Posted June 28, 2022 29 minutes ago, JFskiDan said: someone is going to need to show me where/what this thing is. i like to think i am fairly aware of things, but i have no idea what you guys are talking about. this rusty thing 1 Quote
theprogram4 Posted June 28, 2022 Report Posted June 28, 2022 I literally checked the cams yesterday and was happy to see it still there. The end of an era 😢 1 Quote
Benm Posted July 3, 2022 Report Posted July 3, 2022 (edited) Hole looks bigger than before. There is a concrete square in there but might be for a pole rather than the terminal. No poles or anything but they could be up top. Ton of Spartan race stuff sitting in the lot tho Edited July 3, 2022 by Benm 3 1 Quote
GrilledSteezeSandwich Posted July 4, 2022 Report Posted July 4, 2022 I haven’t paid attention but had blue been updating their Facebook page with new lift constructions updates? Quote
JFskiDan Posted July 4, 2022 Report Posted July 4, 2022 10 hours ago, GrilledSteezeSandwich said: I haven’t paid attention but had blue been updating their Facebook page with new lift constructions updates? 2 1 Quote
toast21602 Posted July 15, 2022 Report Posted July 15, 2022 Really wish a camera was pointed towards the "construction" that might be occurring. A lot of nothing seems to be going on. 1 Quote
GrilledSteezeSandwich Posted July 15, 2022 Report Posted July 15, 2022 16 minutes ago, toast21602 said: Really wish a camera was pointed towards the "construction" that might be occurring. A lot of nothing seems to be going on. Patience young grasshopper. It will be completed by the start of the ski season 1 Quote
indiggio Posted July 15, 2022 Report Posted July 15, 2022 2 hours ago, toast21602 said: Really wish a camera was pointed towards the "construction" that might be occurring. A lot of nothing seems to be going on. Seems like they pointed them even farther away from the action. Quote
enjoralas Posted July 15, 2022 Report Posted July 15, 2022 5 hours ago, toast21602 said: Really wish a camera was pointed towards the "construction" that might be occurring. A lot of nothing seems to be going on. 2 hours ago, indiggio said: Seems like they pointed them even farther away from the action. Here's a screenshot of a partly installed lower lift house: 1 Quote
enjoralas Posted July 26, 2022 Report Posted July 26, 2022 Some digging on the left side of the Main St cam. Can't see much but a pile of dirt and the occasional hoe bucket, but maybe some footers coming soon. 2 1 Quote
GrilledSteezeSandwich Posted July 27, 2022 Report Posted July 27, 2022 Blue hasn’t updated on their Facebook page which is surprising. Quote
GrilledSteezeSandwich Posted July 27, 2022 Report Posted July 27, 2022 On 6/25/2022 at 7:28 AM, toast21602 said: they still have ~5 months. I think it will be done, tested, and inspected before that. Less than 4 months. I will laugh so hard if they don’t get the deadline. Quote
AtomicSkier Posted July 27, 2022 Report Posted July 27, 2022 i would've liked to see all the prep work done by now and left the last 4 months for installation. the lack of footings is questionable. maybe we'll just ski off the vista chair for the first month of the season! @GrilledSteezeSandwich vista talk. 1 1 1 2 1 Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.