GrilledSteezeSandwich Posted November 14, 2022 Report Posted November 14, 2022 They should name the terminal to the new super summit safari six pack, terminal velocity because it moves so fast. Maybe not 9.8 meters per second but fast.. Quote
tnt Posted November 15, 2022 Report Posted November 15, 2022 Holy crap....how did I miss this?!?! So no more main st./burma? Kind of sad really.... And that little lift with they gave lessons at the valley - gone to? Huh. Wild and fun! Quote
tnt Posted November 15, 2022 Report Posted November 15, 2022 Gonna be a bit f crowd pressure on those lower run out trails. Quote
enjoralas Posted November 15, 2022 Report Posted November 15, 2022 9 minutes ago, tnt said: Holy crap....how did I miss this?!?! So no more main st./burma? Kind of sad really.... And that little lift with they gave lessons at the valley - gone to? Huh. Wild and fun! Valley School Triple is still there, but the doubles are indeed gone. Quote
GrilledSteezeSandwich Posted November 15, 2022 Report Posted November 15, 2022 20 minutes ago, tnt said: Holy crap....how did I miss this?!?! So no more main st./burma? Kind of sad really.... And that little lift with they gave lessons at the valley - gone to? Huh. Wild and fun! Wow where have you been lol. You have a lot of posts to catch up on. Quote
enjoralas Posted November 15, 2022 Report Posted November 15, 2022 (edited) I would think they would be trying to kick it into high gear . . . I can't imagine they want to miss many chances to blow on the Valley School hill and delay getting that cash cow up and running. It would be so lol if they can't do anymore work on hoisting the lower house until that tiny operator shack is done because of spacing or something, since I notice they are still working on that today. I realize it's probably more likely they are awaiting a crane rental Edited November 15, 2022 by enjoralas 1 Quote
tnt Posted November 15, 2022 Report Posted November 15, 2022 Blue Mountain uphill capacity approaching Stowe Mountain Resort.... 2 Quote
GrilledSteezeSandwich Posted November 15, 2022 Report Posted November 15, 2022 28 minutes ago, tnt said: Blue Mountain uphill capacity approaching Stowe Mountain Resort.... They need it, Blue does almost as many annual skier visits as stowe. Quote
Larchmont Posted November 16, 2022 Report Posted November 16, 2022 Early season they can run Ski School on Frontier Airlines - I mean Alley - if they need to and allocate the resources there. Quote
GrilledSteezeSandwich Posted November 16, 2022 Report Posted November 16, 2022 14 minutes ago, Larchmont said: Early season they can run Ski School on Frontier Airlines - I mean Alley - if they need to and allocate the resources there. @Ski2Live Live2SkiFrontier airlines talk 1 Quote
enjoralas Posted November 16, 2022 Report Posted November 16, 2022 Unload terminal may be going together? Tough to tell from the Valley cam, but looks like something tall on top of the ridge (crane?) that wasn't there before: 3 1 Quote
enjoralas Posted November 16, 2022 Report Posted November 16, 2022 Cement truck just rolled through the frame headed out from over by the quad. Wonder what they were pouring out of frame that way. Quote
antman12 Posted November 16, 2022 Report Posted November 16, 2022 Just checked the webcam and that's absolutely a crane up top. Quote
antman12 Posted November 16, 2022 Report Posted November 16, 2022 49 minutes ago, enjoralas said: Hopefully they can get the big pieces on the upper terminal today and move the crane down to the valley to tackle the lower terminal tomorrow, then blow like hell without having to worry about the equipment. Seems like they are still missing a piece of the lower terminal. Specifically the end piece, or the "U" piece. Both side pieces have arrived but I dont see the end piece. Could be there in the lot I suppose, but I would assume it would be staged with the other pieces. 1 Quote
antman12 Posted November 16, 2022 Report Posted November 16, 2022 Also, cranes down and it appears we have an upper terminal. 1 1 1 Quote
indiggio Posted November 16, 2022 Report Posted November 16, 2022 3 minutes ago, antman12 said: Seems like they are still missing a piece of the lower terminal. Specifically the end piece, or the "U" piece. Both side pieces have arrived but I dont see the end piece. Could be there in the lot I suppose, but I would assume it would be staged with the other pieces. I just said the same thing in the Zee Lights thread. 1 Quote
enjoralas Posted November 16, 2022 Report Posted November 16, 2022 Action by the lower terminal, a ute just came ripping in and a dude jumped out. Wouldn't be surprised to see the crane come in soon. Quote
enjoralas Posted November 16, 2022 Report Posted November 16, 2022 7 minutes ago, antman12 said: Seems like they are still missing a piece of the lower terminal. Specifically the end piece, or the "U" piece. Both side pieces have arrived but I dont see the end piece. Could be there in the lot I suppose, but I would assume it would be staged with the other pieces. 4 minutes ago, indiggio said: I just said the same thing in the Zee Lights thread. I could see them leaving that piece further back and offscreen since it should be significantly smaller. I bet the sides are where they are because of their length and inability to easily move them over later. 3 Quote
JFskiDan Posted November 16, 2022 Report Posted November 16, 2022 2 hours ago, enjoralas said: Cement truck just rolled through the frame headed out from over by the quad. Wonder what they were pouring out of frame that way. They are pouring the pad for the new Scrapple Shack. 1 1 1 Quote
Benm Posted November 16, 2022 Report Posted November 16, 2022 im surprised they had a crane out today, it was windy as shit. 1 Quote
Mixilplix Posted November 16, 2022 Report Posted November 16, 2022 (edited) I drove by on my way home from work and indeed the two side pieces of the upper terminal looked to be in place... If it's done by Christmas does that make it a Christmas miracle? Edited November 16, 2022 by Mixilplix 2 1 Quote
RidgeRacer Posted November 16, 2022 Report Posted November 16, 2022 18 minutes ago, Mixilplix said: I drove by on my way home from work and indeed the two side pieces of the upper terminal looked to be in place... If it's done by Christmas does that make it a Christmas miracle? I think it would be. Quote
RidgeRacer Posted November 16, 2022 Report Posted November 16, 2022 2 hours ago, JFskiDan said: They are pouring the pad for the new Scrapple Shack. I'd order scrapple from them but only if the call it "the Scrapple Haus" 1 Quote
JFskiDan Posted November 17, 2022 Report Posted November 17, 2022 41 minutes ago, RidgeRacer said: I'd order scrapple from them but only if the call it "the Scrapple Haus" I will see what i can do. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.