1 hour ago, Schif said:

Nothing is getting good until we see some concrete in the ground. 

The supply chain is screwed up, Jim Daly probably forgot to fax the purchase order back so things are delayed.  Worst case we have this new lift for 2023-24 season.  We all spend 99% of the time on the quad and six pack anyway. 

Posted

i'm willing to bet they still have a shitload. just waiting for a new biker video to pop up. there was a recently posted one, but i don't think the video itself was recent.

  • Like 1
Posted

Been watching a few other resorts installing lifts. Sunday river recently posted a pic of concrete going in for the summit terminal as well, so it would appear they are on pace with Blue, without knowing the status of tower footings. 
i would think they need to be hitting the concrete pretty hard over the next 2 weeks. We have had issues with concrete this year, so Blue might be too, but its a size-able job, so it probably puts them pretty high on the suppliers list. 

  • Like 4
Posted
4 minutes ago, JFskiDan said:

Been watching a few other resorts installing lifts. Sunday river recently posted a pic of concrete going in for the summit terminal as well, so it would appear they are on pace with Blue, without knowing the status of tower footings. 
i would think they need to be hitting the concrete pretty hard over the next 2 weeks. We have had issues with concrete this year, so Blue might be too, but its a size-able job, so it probably puts them pretty high on the suppliers list. 

I’m guessing they aren’t buying the ready mix stuff from Lowe’s or Home Depot that we use to make foundations/footers in cemeteries. 

Posted
On 7/29/2022 at 9:01 AM, GrilledSteezeSandwich said:

I’m guessing they aren’t buying the ready mix stuff from Lowe’s or Home Depot that we use to make foundations/footers in cemeteries. 

Not unless the ready mix comes in a 1:1 cement truck per footer 

Posted
31 minutes ago, Benm said:

@AirheadD8 thanks for those photos

👍 It was a good day. Second photo I’m trying to figure out what the neat pile of things is about a 100yds up from the parking lot. Sheaves or maybe Rebar cages for poles footers? 

Posted
1 hour ago, AirheadD8 said:

👍 It was a good day. Second photo I’m trying to figure out what the neat pile of things is about a 100yds up from the parking lot. Sheaves or maybe Rebar cages for poles footers? 

if you're talking about in front of the learning lift, its likely chairs. when i was there, some were in that spot. mixilplix also posted a photo that showed some there. 

Posted
On 7/28/2022 at 1:07 PM, GrilledSteezeSandwich said:

The supply chain is screwed up, Jim Daly probably forgot to fax the purchase order back so things are delayed.  Worst case we have this new lift for 2023-24 season.  We all spend 99% of the time on the quad and six pack anyway. 

 

 

can we all just show up with bags of concrete? 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...