Jump to content

Main Park


adrock

Recommended Posts

We have been blowing in the Bushkill Park for around 48 hours now. We are going to continue to blow for the next two days and we will be building the park Wednesday and Thursday. Barring any major setbacks the park should be ready by Friday. We are not going to build the pipe yet. Once we get some more terrain open we will go back to the pipe and start blowing that. I will have a park layout soon. We currently have our incubator learning park open which has a nice progression of low, wide ride-on boxes and rails leading up to a gap on flat-down box. Perfect for little guys learning how to slide.

Link to comment
Share on other sites

We have been blowing in the Bushkill Park for around 48 hours now. We are going to continue to blow for the next two days and we will be building the park Wednesday and Thursday. Barring any major setbacks the park should be ready by Friday. We are not going to build the pipe yet. Once we get some more terrain open we will go back to the pipe and start blowing that. I will have a park layout soon. We currently have our incubator learning park open which has a nice progression of low, wide ride-on boxes and rails leading up to a gap on flat-down box. Perfect for little guys learning how to slide.

 

that layout better be sweet... nobody likes a park that doesnt flow, you guys did a great job last year. gnar gnar for sure! keep up the great work :nana

Link to comment
Share on other sites

Parkbuilder.

 

I will email the layout to you for final approval before building......lol......hope everything is goin well in Killy.....make sure you study.....keep the partying to a minimum.....well, on second thought, screw that, party it up you only live once.....but find a little time to study....

Link to comment
Share on other sites

hell yeah, your park was alot of fun least season, definately gonna get up there soon.

 

shawnee was a kept secret last year. thier park was off the radar. It was really sweet comparitively the 2 times we were there mid season last year. Hope you guys do more of the same now that winter got here.

Link to comment
Share on other sites

The progression park was pretty jank the other day. For some reason all the features were located on the side of the trail, so you had to edge on the snow to end up flat on the features. Also that flat-down needs trashed or totally re worked. I had fun anyways though.

 

... Still better than CB's park :banghead

Link to comment
Share on other sites

The progression park was pretty jank the other day. For some reason all the features were located on the side of the trail, so you had to edge on the snow to end up flat on the features. Also that flat-down needs trashed or totally re worked. I had fun anyways though.

 

... Still better than CB's park

 

 

 

The reason that we had to use the side of the trail is because our ski school will be using the other side of that trail for two hours on weeknights to teach lessons. We have a huge group lesson business and with the limited terrain open they will have to use that trail. I hope it didn't create too big of a problem. It's a little tough when you have people with different needs that you are trying to accomodate in a limited amount of space. Also, one of the problems we had in our park last year was people just riding down. We thought that by putting features on one side and leaving the other side open then people who were just "riding through" would stay out of the way of those that were using the features. As for the flat-down....it came out slightly out of level to the left. If this was what you were referring to it will be re-set in the next day or two. Thanks for the feedback.

Link to comment
Share on other sites

From what I hear you don't let the park crew make lips in the incubator because everything has to be ride on.... scrap that. let them make small street style gaps where you can hit it street style or straight on. You going to have too steep of a learning curve or a bad main park. Also, take the rail out of the bottom and put them in the incubator.

Link to comment
Share on other sites

nice, i wanna check out that other park too, i liked the mc style boxes in the pics...... but uh yea still..get a good pipe, campgaws is better then urs

 

the pipe had plenty of set backs last year, one of which is snowmaking. with the poor weather last year (yet better than this year's!) its tough to maintain snow to the rest of the resort yet alone a pipe that absorbs so much snowmaking. The economins of snowmaking are an intricate part to the whole picture.

 

Adam, I am doing very well right now... the snow is awsome, and although i'm 21 now i have plenty of other priorities/resposibilities. ( I recomend the lookout bar n grill... free hot wings at happy hour from 3-6 :naughty ) Jay Rosenbaum our park and pipe director has really taken me under his wing and ive learned much more safety aspects as well as the buisness end of parks. Give me your email adress and Ill sneak you some super cheap ideas for features. Ive also been in the shop alot fixing new features as well as fabricating new ones. (Flat down flat box - oh yea cory and me.) Let me know around graduation when shawnee is ready for a parks department... (when the weather changes! I know I know... cash rules everything around me... C.R.E.A.M) Godd luck guys with your building! :rock

 

And finally... Check out shawnee's parks, Its a hidden gem.

Edited by parkbuilder
Link to comment
Share on other sites

As for the flat-down....it came out slightly out of level to the left. If this was what you were referring to it will be re-set in the next day or two. Thanks for the feedback.

 

It was mounted crooked but that was only a minor setback. I think the rails are higher than the sliding surface and they felt super sticky. Everytime I tried to slide it, it was super sketchy. Maybe it just needed to be filed?

Link to comment
Share on other sites

The Bushkill Park will be open Saturady! The layout is as follows. Down Rail, Jump, Jump, Mailbox on hip, Flat down box, Up box - Double Staircase with flat down single barrel, flat down box, flat down rail- C-box, Down flat down rail, Step-up box, Flat down flat. The park should be completed Saturaday night. A couple more hits and rails to be put in. Check it out and let us know what you think...

Link to comment
Share on other sites

The Bushkill Park will be open Saturady! The layout is as follows. Down Rail, Jump, Jump, Mailbox on hip, Flat down box, Up box - Double Staircase with flat down single barrel, flat down box, flat down rail- C-box, Down flat down rail, Step-up box, Flat down flat. The park should be completed Saturaday night. A couple more hits and rails to be put in. Check it out and let us know what you think...

What kind of education do you have? Saturaday?

Link to comment
Share on other sites

What kind of education do you have? Saturaday?

 

Sorry that I have a typo in my post....Post was done at 2:30 AM after working since 8:00 AM the previous morning. But, if you are going to point out a mistake at least quote the mistake correctly....lol....I actually spelled it Saturady....not Saturaday....I will proofread better next time...Thank you for your feedback :lol

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...